TRN-27
Highway lane capacity
c = c0 N fw fHV fp. HCM multilane snapshot, c0 ≈ 2200 pc/h/ln.
Governing equation
where
- c_0
- Ideal capacity (pc/h/ln)
- N
- Lanes (—)
- f_w
- Width factor (—)
- f_{HV}
- Heavy-vehicle factor (—)
- f_p
- Driver factor (—)
- c
- Capacity (veh/h)
The figure, part by part
Each numbered marker wears the color of its card. Hover a card to light the marker. Tap a marker to jump to that card. The slider walks a red point along the curve; Animate drawing traces it like a pen.
Governing law — red
Domain of the variable — blue
Response curve — green
Rate of change — amber
Lecture brief
Historical brief
Highway and traffic theory crystallized with Greenshields’ 1935 speed–density line, then AASHTO stopping sight and equivalent axles. The lab is that operational arithmetic of flow, braking and pavement load. This sheet (TRN-27 — Highway lane capacity) is the form associated with HCM. Working symbols: , , , , . Ideal capacity is derated for lane width, heavy vehicles and driver population. fHV = 1/(1+PT(ET−1)).
Purpose
Live realistic example
In symbols
Calculator
Inputs
Outputs
- Capacity c5702 veh/h
Watch on YouTube
Free library
Full libraryFree PDF / open book
- LibreTexts Engineering bookshelfLibreTexts · CC · Free PDF / open book
- SI Brochure (BIPM)BIPM · Free PDF / open book
- FHWA Hydraulics libraryFHWA · Free PDF / open book
YouTube channels
Narration of this film
N lanes, three adjustment factors, a capacity.
Ideal capacity is derated for lane width, heavy vehicles and driver population. fHV = 1/(1+PT(ET−1)).
Watch on YouTube