INGENIA

SRV-28

GPS baseline precision

σ = a + b·D. Static GNSS: a in mm, b in ppm of the baseline D.

Reading speed
GNSSGPS baseline

Governing equation

σ=a+bD\sigma=a+b\,D

where

a
Constant a (mm)
b
Scale b (ppm)
D
Baseline (km)
\sigma
Baseline σ (mm)

Lecture brief

Historical brief

From chain and theodolite through Bowditch’s compass-rule (1802) to GPS PDOP, surveying is the propagation of small errors across a network. These sheets close traverses, reduce stadia and state map scale. This sheet (SRV-28 — GPS baseline precision) is the form associated with GPS baseline. Working symbols: aa, bb, DD \rightarrow σ\sigma. Manufacturer specs quote a + b ppm. Ambiguity-fixed carrier phase on a short baseline sits near a few millimetres.

Purpose

Purpose: compute σ\sigma from aa, bb, DD in Surveying via σ=a+bD\sigma=a+b\,D σ = a + b·D. Static GNSS: a in mm, b in ppm of the baseline D. Use it when a real surveying question must be answered in SI before a code check.

Live realistic example

In symbols

Live case. Given a=3.000mma = 3.000\,\mathrm{mm}, b=0.500ppmb = 0.500\,\mathrm{ppm}, D=8.000kmD = 8.000\,\mathrm{km}, the governing relation σ=a+bD\sigma=a+b\,D yields σ=7.00mm\sigma = 7.00\,\mathrm{mm}. Two receivers, a baseline, a growing σ. Move a slider: the numbers are this situation, not a canned story.

Calculator

Inputs

Outputs

  • Baseline σ \sigma7.00 mm
Reading speed

Watch on YouTube

Free library

Full library

Free PDF / open book

YouTube channels

SRV-28 · gauge
00:0 / 00:08

Narration of this film

Two receivers, a baseline, a growing σ.

Manufacturer specs quote a + b ppm. Ambiguity-fixed carrier phase on a short baseline sits near a few millimetres.

Reading speed

Watch on YouTube