INGENIA

GEO-36

Secondary compression Cαe

ΔHs = [Cαe H /(1+e0)] log10(t2/t1) after primary ends.

Reading speed
ConsolidationMesri Cαe

Governing equation

ΔHs=CαeH1+e0log⁡10(t2/t1)\Delta H_s=\dfrac{C_{\alpha e} H}{1+e_0}\log_{10}(t_2/t_1)

t2∈[1,200]t_2 \in \left[1, 200\right]

where

C_{\alpha e}
Secondary index (—)
H
Thickness (m)
e_0
Void ratio (—)
t_1
Start of secondary (yr)
t_2
Time of interest (yr)
\Delta H_s
Secondary settlement (mm)

The figure, part by part

Each numbered marker wears the color of its card. Hover a card to light the marker. Tap a marker to jump to that card. The slider walks a red point along the curve; Animate drawing traces it like a pen.

GEO-36 · decay
00:0 / 00:08
①

Governing law — red

ΔHs=CαeH1+e0log⁡10(t2/t1)\Delta H_s=\dfrac{C_{\alpha e} H}{1+e_0}\log_{10}(t_2/t_1)

t2∈[1,200]t_2 \in \left[1, 200\right]

t2=1t_2 = 1ΔHs=0.019\Delta H_s = 0.019

②

Domain of the variable — blue

t_2_{\min} = 1,\quad t_2_{\max} = 200

t2∈[1,200]t_2 \in \left[1, 200\right]

t2=1t_2 = 1t2=1t_2 = 1

③

Response curve — green

ΔHs=CαeH1+e0log⁡10(t2/t1)\Delta H_s=\dfrac{C_{\alpha e} H}{1+e_0}\log_{10}(t_2/t_1)

t2∈[1,200]t_2 \in \left[1, 200\right]

t2=1t_2 = 1ΔHs=0.019\Delta H_s = 0.019

④

Rate of change — amber

dΔHsdt2\frac{\mathrm{d}\Delta H_s}{\mathrm{d}t_2}

t2∈[1,200]t_2 \in \left[1, 200\right]

t2=2.252t_2 = 2.252ΔHs′=9.314\Delta H_s^{\prime} = 9.314

Lecture brief

Historical brief

Soil mechanics became a quantitative laboratory after Karl von Terzaghi’s 1925–1943 work on effective stress, consolidation and bearing. These sheets still size shallow foundations, retaining walls, piles and drainage in SI. This sheet (GEO-36 — Secondary compression Cαe) is the form associated with Mesri Cαe. Working symbols: CαeC_{\alpha e}, HH, e0e_0, t1t_1, t2t_2 →\rightarrow ΔHs\Delta H_s. Mesri: Cαe/Cc ≈ 0.04 ± 0.01 for inorganic clay. Creep on log-time after Tv charts have finished.

Purpose

Purpose: compute ΔHs\Delta H_s from CαeC_{\alpha e}, HH, e0e_0, t1t_1, t2t_2 in Geotechnical engineering via ΔHs=CαeH1+e0log⁡10(t2/t1)\Delta H_s=\dfrac{C_{\alpha e} H}{1+e_0}\log_{10}(t_2/t_1) ΔHs = [Cαe H /(1+e0)] log10(t2/t1) after primary ends. Use it when a real geotechnical engineering question must be answered in SI before a code check.

Live realistic example

In symbols

Live case. Given Cαe=0.015 —C_{\alpha e} = 0.015\,\mathrm{—}, H=6.000 mH = 6.000\,\mathrm{m}, e0=1.100 —e_0 = 1.100\,\mathrm{—}, t1=1.000 yrt_1 = 1.000\,\mathrm{yr}, t2=30.000 yrt_2 = 30.000\,\mathrm{yr}, the governing relation ΔHs=CαeH1+e0log⁡10(t2/t1)\Delta H_s=\dfrac{C_{\alpha e} H}{1+e_0}\log_{10}(t_2/t_1) yields ΔHs=63.3 mm\Delta H_s = 63.3\,\mathrm{mm}. A clock after primary, a slow settlement. Move a slider: the numbers are this situation, not a canned story.

Calculator

Inputs

Outputs

  • Secondary settlement \Delta H_s63.3 mm
Reading speed

Watch on YouTube

Free library

Full library

Free PDF / open book

YouTube channels

GEO-36 · decay
00:0 / 00:08

Narration of this film

A clock after primary, a slow settlement.

Mesri: Cαe/Cc ≈ 0.04 ± 0.01 for inorganic clay. Creep on log-time after Tv charts have finished.

Reading speed

Watch on YouTube